<sub id="lp3lv"></sub>

<sub id="lp3lv"></sub>
<sub id="lp3lv"></sub>
<sub id="lp3lv"></sub>

<sub id="lp3lv"></sub>
<sub id="lp3lv"></sub>

<sub id="lp3lv"></sub>
    <address id="lp3lv"></address>
    • One-Stop Service Of WholeValue Chain
    • Our Service
    • Our Business
    • R & D And Test

    Shuangyushu Heat Supply Plant, Beijing

    Release time:2009-07-07 Article source: Reading times: A+ A A-

    Beijing Shuangyushu Heat Supply Plant (BSHSP) is one of "Beijing Environmental Protection Projects" utilizing World Bank loan. Utilizing the natural gas as the fuel, its waste gas emissions such as flue dust, SO2 and NOX were much lower that the norms. It took place of 364 boilers in about 142 upwind boiler houses and reduced the air pollution in the district.

    Its heating capacity is 696MW for 12million m² of floor area, the largest in Asia. It installed 6X116MW gas-fired hot water boilers (largest unit capacity in China), with a maximum hot water supply capacity of 8250t/h. its heating network design pressure is 1.6MPa, and supplying/returning water temperature 50/40-70℃. In the plant, installed gas offtake station, of which the maximum diameter of the gas tube is DN1000. BSHSP has high automatic control level and advanced design. It has received a lot of visitors from heat supply units from all over the country, and is highly appraised by experts. The project was awarded the prize of Great-Wall Cup, the highest prize for project construction in Beijing and the bronze prize for Science & Technology Progress in Machinery Industry of China.

    Quikly link

    Contact us

    ADD : CNEEC BLDG., 9, SOUTH SHOUTI RD., HAIDIAN DISTRICT, BEIJING 100048 P.R.CHINA

    TEL : (8610)68798899

    FAX : (8610)68798000

    E-MAIL : cneec@cneec.com.cn

    Legal Notice| Site Map

    Copyright?China National Electric Engineering Co., Ltd. , All Rights Reserved

    夫妻性姿势真人示范 - 视频 - 在线观看 - 影视资讯 - 品赏网